Title | Planning unit commitment of hybrid power systems in Penghu | ||
Keyword | |||
Abstract | Penghu is one of the mainly Taiwanese outlying island, also the biggest stand-alone power system except Taiwan, it¡¦s mainly powered by twelve diesel engine generators in Chienshan power plant. For efficiently use the wind power in Penghu, it built eight 600kW and six 900kw wind turbines to the system one after another, but because the wind turbines peak load are no output in summer, and off-peak are the biggest output that can¡¦t load in winter, so the plan isn¡¦t considered to integrated into the wind farm in Penghu, and as far as Penghu, every diesel engine generators in Chienshan power plant is large. In particular in off-peak period, it cause the Generator power in total Power generation ratio over loaded, when system happened diesel engine generators trip disturbances, or all wind turbines tripped, it cause the seriously Impact to system frequency. In this paper, we used the power system analyze software PSS/E (Power System Simulator for Engineering) to simulate that use many of the small generators replace the large generators in Chienshan power plant to reduce the Generator power in total Power generation ratio, when system happened trip disturbances, it reduce the effect to the frequency, the simulate result can provide to Taiwan Power Company for reference of upgrade. |
||
Advisor Committee | |||
Files | indicate in-campus access immediately and off-campus access at one year | ||
Date of Defense | 2014-07-10 | Date of Submission | 2014-07-31 |