URN | etd-0718122-183112 | Statistics | This thesis had been viewed 119 times. Download 0 times. |
Author | Yi-Hua Huang | ||
Author's Email Address | No Public. | ||
Department | Department of construction & spatial design | ||
Year | 2021 | Semester | 2 |
Degree | Master | Type of Document | Master's Thesis |
Language | zh-TW.Big5 Chinese | Page Count | 118 |
Title | The Comparison of Citizens Applying Statute for Expediting Reconstruction of Urban Unsafe and Old Buildings vs. Local Regulations of Disaster-Proof Buildings Regeneration ˇV A Case Study of Sea-Sand Building in New Taipei City |
||
Keyword | |||
Abstract | Taiwan is located on the Pacific Rim, the so called ˇ§Ring of Fireˇ¨, where earthquakes occur frequently. "Disaster-damaging buildings" endangering the safety of public at any time. Most of these buildings are sited on the sub-urban area of New Taipei City, the coast along the Danshui River. In such area, the needs for urban-renewal are far more than the construction companies could provide, and it also cost a lot of time to go through the procedures in accordance with the urban renewal regulations. Moreover, each community has its own unique situation referring to building hazards, locations, etc. This study sums up four cases of "Sea-Sand Building Reconstruction" in New Taipei City and gives a decision guide by comparing the difference between applying for the Statute for Expediting Reconstruction of Urban Unsafe and Old Buildings and applying for Local Regulation of Disaster-Proof Building Regeneration. To summarize the cases study, the local regulation has a better result on bulk reward. However, the period of limitation for such local regulation only lasts three years, which means it requires the damaging building be demolished in advance. If not, the residents would be under the risk of having no houses to live in due to the expiration of their application for reconstruction. To avoid this kind of dilemma and to formulates a correct reconstruction policy, it requires legal supports and restrictions from the government, and a higher attention for the majorities. The reconstruction process could be accomplished efficiently only with a responsible and transparent cooperation between the construction company and the government. |
||
Advisor Committee | |||
Files | indicate access worldwide | ||
Date of Defense | 2022-06-27 | Date of Submission | 2022-07-18 |