URN |
etd-0710113-120331 |
Statistics |
This thesis had been viewed 694 times. Download 12 times.
|
Author |
Ming-Te Wang |
Author's Email Address |
wangmite@gmail.com |
Department |
Institute of construction technology |
Year |
2012 |
Semester |
2 |
Degree |
Master |
Type of Document |
Master's Thesis |
Language |
zh-TW.Big5 Chinese |
Page Count |
110 |
Title |
Knowledge Base of Construction Interface of Building and Electrical Facilities for Hospital Operating Room |
Keyword |
Operation room ;- Interface;- Knowledge Base
Operation room ;- Interface;- Knowledge Base
|
Abstract |
There are always conflicts of construction interface between architectural engineering and electrical engineering in the designing stage because the designs are from different suppliers. If there is no integrated design drawing by suppliers during the designing process, the project contract award is briefed according to the drawings with text by designers and contractors always undertake construction in accordance with drawings of one-side-story. Without the integration in design drawings between architectural engineering and electrical engineering at the pre-construction stage, many conflicts will occur during the construction. Hospital architectural engineering is not a majority in the industry. It is a special field that demands expertise. Works for operation rooms are the areas full of the most complex in the hospital projects. This research first explores the implementation standard for the operation rooms of medical institutions by the National Medical Law and reviews the technical regulations of architecture and building, and checks the set-up standard of equipment for fire safety for all kind of places and locations. It focuses and highlights on the criteria demand and request for operation rooms in hospitals by relevant laws and regulations, covering the dust-free grade of different levels for operation rooms as well. The study aims to solve the challenge of keeping operation rooms clean, integrating interface of different medical equipments, infection control, patientsˇ¦ privacy needs, the consolidation of various medical equipments, the building renovation, the installation of electrical and mechanical equipments. It helps solve construction engineersˇ¦ and contractorsˇ¦ problems by providing drawings, photos and solution suggestions. |
Advisor Committee |
Yung-Ming Sun - advisor
Chun-Tao Chen - co-chair
Jeng-Ywan Shih - co-chair
|
Files |
indicate in-campus access at 1 years and off-campus access at 5 years |
Date of Defense |
2013-06-26 |
Date of Submission |
2013-07-15 |