URN | etd-0215123-172338 | Statistics | This thesis had been viewed 90 times. Download 2 times. |
Author | Te Huang Hung | ||
Author's Email Address | benhung@hotmail.com | ||
Department | Department of construction & spatial design | ||
Year | 2022 | Semester | 1 |
Degree | Master | Type of Document | Master's Thesis |
Language | zh-TW.Big5 Chinese | Page Count | 105 |
Title | Discussion on the Construction of Deep Guide Ditch for t he Reconstruction of Old Buildings Taking the New Project of the Property Insurance Building as an Example |
||
Keyword | |||
Abstract | This study takes the construction of deep guide trenches before the reconstruction of old buildings as an example . The basement deep guide trenches were constructed before the old building itself was demolished. Based on this research, the construction met hods in the case were sorted out. The research shows that no matter what the demolition method is Classification, construction of new diaphragm wall on the inner side of the old basement with deep guide trench wall, or demolition and construction (substitu tion method) method, adopt "partition partial destruction", and set "unreinforced compartment" on the deep guide trench wall. The guide wall is connected with the old structural floor to set up "stiffened buttresses", which is more in line with economic ef ficiency and construction safety in practice. Key |
||
Advisor Committee | |||
Files | indicate access worldwide | ||
Date of Defense | 2023-01-12 | Date of Submission | 2023-02-15 |