Title page for etd-0215123-172338


URN etd-0215123-172338 Statistics This thesis had been viewed 38 times. Download 2 times.
Author Te Huang Hung
Author's Email Address benhung@hotmail.com
Department Department of construction & spatial design
Year 2022 Semester 1
Degree Master Type of Document Master's Thesis
Language zh-TW.Big5 Chinese Page Count 105
Title Discussion on the Construction of Deep Guide Ditch
for t he
Reconstruction of Old Buildings Taking the New Project of the
Property Insurance Building as an Example
Keyword
  • stiffened buttress.
  • deep guide trench
  • continuous wall
  • partition partial br eaking
  • unreinforced compartment
  • unreinforced compartment
  • partition partial br eaking
  • continuous wall
  • deep guide trench
  • stiffened buttress.
  • Abstract This study takes the construction of deep guide trenches before the
    reconstruction of old buildings as an example . The basement deep guide
    trenches were constructed before the old building itself was demolished. Based
    on this research, the construction met hods in the case were sorted out. The
    research shows that no matter what the demolition method is Classification,
    construction of new diaphragm wall on the inner side of the old basement with
    deep guide trench wall, or demolition and construction (substitu tion method)
    method, adopt "partition partial destruction", and set "unreinforced
    compartment" on the deep guide trench wall. The guide wall is connected with
    the old structural floor to set up "stiffened buttresses", which is more in line with
    economic ef ficiency and construction safety in practice.
    Key
    Advisor Committee
  • Shi-Fon Su - advisor
  • JIA-CHONG DU - co-chair
  • Pio-Go Hsieh - chair
  • Files indicate access worldwide
    Date of Defense 2023-01-12 Date of Submission 2023-02-15

    Browse | All Available ETDs | Chinese Search Version | Home

    If you have more questions or technical problems, please contact Tungnan University